sprint-status

v2026.09.24

Fast, concise sprint snapshot — burndown and emerging risks for situational awareness. 'How is the sprint going?'

GitHub
Install command
npx skhub add donchitos/sprint-status
Markdown
SKILL.md

!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys story_granularity

Sprint Status

This is a fast situational awareness check, not a sprint review. It reads the current sprint plan and story files, scans for status markers, and produces a concise snapshot in under 30 lines. For detailed sprint management, use /sprint-plan update or /milestone-review.

This skill is read-only. It never proposes changes, never asks to write files, and makes at most one concrete recommendation.

story_granularity — it sets the grain of the burn-down read: feature-sized chunks at coarse, task-sized at balanced (default), AC-sized at fine.


1. Find the Sprint

Argument: $ARGUMENTS[0] (blank = use current sprint)

  • If an argument is given (e.g., /sprint-status 3), search production/sprints/ for a file matching sprint-03.md, sprint-3.md, or similar. Report which file was found.
  • If no argument is given, find the most recently modified file in production/sprints/ and treat it as the current sprint.
  • If production/sprints/ does not exist or is empty, report: "No sprint files found. Start a sprint with /sprint-plan new." Then stop.

Read the sprint file in full. Extract:

  • Sprint number and goal
  • Start date and end date
  • All story or task entries with their priority (Must Have / Should Have / Nice to Have), owner, and estimate

2. Calculate Days Remaining

Using today's date and the sprint end date from the sprint file, calculate:

  • Total sprint days (end minus start)
  • Days elapsed
  • Days remaining
  • Percentage of time consumed

If the sprint file does not include explicit dates, note "Sprint dates not found — burndown assessment skipped."


3. Scan Story Status

First: check for production/sprint-status.yaml.

If it exists, read it directly — it is the authoritative source of truth. Extract status for each story from the status field. No markdown scanning needed. Use its sprint, goal, start, end fields instead of re-parsing the sprint plan.

If sprint-status.yaml does not exist (legacy sprint or first-time setup), fall back to markdown scanning:

  1. If the entry references a story file path, check if the file exists. Read the file and scan for status markers: DONE, COMPLETE, IN PROGRESS, BLOCKED, NOT STARTED (case-insensitive).
  2. If the entry has no file path (inline task in the sprint plan), scan the sprint plan itself for status markers next to that entry.
  3. If no status marker is found, classify as NOT STARTED.
  4. If a file is referenced but does not exist, classify as MISSING and note it.

When using the fallback, add a note at the bottom of the output: "⚠ No sprint-status.yaml found — status inferred from markdown. Run /sprint-plan update to generate one."

Optionally (fast check only — do not do a deep scan): grep the code root for a directory or file name that matches the story's system slug to check for implementation evidence. This is a hint only, not a definitive status.

Stale Story Detection

After collecting status for all stories, check each IN PROGRESS story for staleness:

  • Resolve the dates with one grep across the story set, not a read per story — a date is a single line, and opening every in-progress story to find it is the whole cost of this check:
    Grep pattern="\*{0,2}(Last Updated|Updated|last-updated|updated_at)\*{0,2}[[:space:]]*:" glob="production/epics/**/story-*.md" output_mode="content"
    
    That one pattern accepts every field-name variant. A story with no match has no date, which is not the same as being stale — report it as "never stamped" and do not compute an age for it.

The \*{0,2} wrappers are why this works at all. /create-stories emits > **Last Updated**: …, so a pattern requiring : immediately after the word matched no story ever written. Combined with the "no match = never stamped" rule directly above — which is correct in itself — the failure was completely silent: every in-progress story reported as never stamped, and stale-story detection never once fired. A bare Updated: anchor will regress it.

  • Calculate days since that date using today's date.
  • If the date is more than 4 days ago, flag the story as STALE. (4-day threshold accounts for weekends — a story last touched on Friday won't appear stale until Wednesday.)
  • If no date field is found in the story file, note "no timestamp — cannot check staleness."
  • If the story has no referenced file (inline task), note "inline task — cannot check staleness."

STALE stories are included in the output table and collected into an "Attention Needed" section (see Phase 5 output format).

Stale story escalation: If any IN PROGRESS story is flagged STALE (no progress in 4+ days), the burndown verdict is upgraded to at least At Risk — even if the completion percentage is within the normal On Track window. Record this escalation reason: "At Risk — [N] story(ies) with no progress in [N] days."


4. Burndown Assessment

Calculate:

  • Tasks complete (DONE or COMPLETE)
  • Tasks in progress (IN PROGRESS)
  • Tasks blocked (BLOCKED)
  • Tasks not started (NOT STARTED or MISSING)
  • Completion percentage: (complete / total) * 100

Assess burndown by comparing completion percentage to time consumed percentage:

  • On Track: completion % is within 10 points of time consumed % or ahead
  • At Risk: completion % is 10-25 points behind time consumed %
  • Behind: completion % is more than 25 points behind time consumed %

If dates are unavailable, skip the burndown assessment and report "On Track / At Risk / Behind: unknown — sprint dates not found."


5. Output

Keep the output concise. The story status table is mandatory — do not truncate it. Aim for under 50 lines total; omit the Emerging Risks section if nothing notable was found. Use this format:

## Sprint [N] Status — [Today's Date]
**Sprint Goal**: [from sprint plan]
**Days Remaining**: [N] of [total] ([% time consumed])

### Progress: [complete/total] tasks ([%])

| Story / Task         | Priority   | Status      | Owner   | Blocker        |
|----------------------|------------|-------------|---------|----------------|
| [title]              | Must Have  | DONE        | [owner] |                |
| [title]              | Must Have  | IN PROGRESS | [owner] |                |
| [title]              | Must Have  | BLOCKED     | [owner] | [brief reason] |
| [title]              | Should Have| NOT STARTED | [owner] |                |

### Attention Needed
| Story / Task         | Status      | Last Updated   | Days Stale | Note           |
|----------------------|-------------|----------------|------------|----------------|
| [title]              | IN PROGRESS | [date or N/A]  | [N days]   | [STALE / no timestamp — cannot check staleness / inline task — cannot check staleness] |

*(Omit this section entirely if no IN PROGRESS stories are stale or have timestamp concerns.)*

### Burndown: [On Track / At Risk / Behind]
[1-2 sentences. If behind: which Must Haves are at risk. If on track: confirm
and note any Should Haves the team could pull.]

### Must-Haves at Risk
[List any Must Have stories that are BLOCKED or NOT STARTED with less than
40% of sprint time remaining. If none, write "None."]

### Emerging Risks
[Any risks visible from the story scan: missing files, cascading blockers,
stories with no owner. If none, write "None identified."]

### Recommendation
[One concrete action, or "Sprint is on track — no action needed."]

6. Fast Escalation Rules

Apply these rules before outputting, and place the flag at the TOP of the output if triggered (above the status table):

Critical flag — if Must Have stories are BLOCKED or NOT STARTED and less than 40% of the sprint time remains:

SPRINT AT RISK: [N] Must Have stories are not complete with [X]% of sprint
time remaining. Recommend replanning with `/sprint-plan update`.

Completion flag — if all Must Have stories are DONE:

All Must Haves complete. Team can pull from Should Have backlog.

Missing stories flag — if any referenced story files do not exist:

NOTE: [N] story files referenced in the sprint plan are missing.
Run `/story-readiness sprint` to validate story file coverage.

Collaborative Protocol

This skill is read-only. It reports observed facts from files on disk.

  • It does not update the sprint plan
  • It does not change story status
  • It does not propose scope cuts (that is /sprint-plan update)
  • It makes at most one recommendation per run

For more detail on a specific story, the user can read the story file directly or run /story-readiness [path].

For sprint replanning, use /sprint-plan update. For end-of-sprint retrospective, use /retrospective.

Discovery
Tags

No tags published for this skill.

Version
Latest version metadata

Version

v2026.09.24

Published

Sep 24, 2026

Category

Uncategorized

License

MIT

Source path

.claude/skills/sprint-status

Default branch

main

Latest commit

7ed2c3e

Tree SHA

163640a