RemoFirst Offline Workflow Rehearsal
Overview
Validate mappings and controls with synthetic data against RemoFirst's documented dashboard reports, two-column contractor-timesheet CSV upload, and named Workday/ADP connectors, which do not include a general public sandbox API. A local loop must therefore model documented inputs and decisions without claiming provider execution parity.
Prerequisites
- The workflow and current first-party source that defines its fields.
- A fixture directory containing synthetic—not anonymized production—records.
- Expected counts, invariants, failure cases, and approval owner.
Current Contract
- Contractor monthly timesheet CSV requires exactly
EmailandTotal Monthly Hours; emails must match active accounts and hours allow up to two decimals. - Downloadable reports include employee and contractor data and are sensitive.
- Workday mapping and sync semantics are documented separately; local fixtures are a model and cannot prove live connector behavior.
Instructions
- Name the workflow, source article, fixture schema, assumptions, and the provider behavior that the rehearsal explicitly cannot prove.
- Generate synthetic identities, countries, amounts, dates, and record keys. Reject copied or merely masked production rows.
- Encode field names, types, required/optional rules, uniqueness, rounding, and allowed state transitions from the reviewed source.
- Add positive fixtures plus missing header, duplicate, invalid decimal, unknown identity, wrong period, stale mapping, and unsafe-field cases.
- Run deterministic parsing and reconciliation: input, accepted, rejected, duplicate, and output totals must balance.
- Produce a preview and rollback/checkpoint design. Do not create a live import file until a human approves both mapping and data source.
- Mark PASS only for local controls. Record live validation as PENDING and assign an approved operator for the later dashboard step.
Tool Discipline
Use Read, Glob, and Grep to inspect schemas and fixtures. Use Write/Edit only for approved synthetic fixtures, mappings, tests, and reports. Do not log in, download live reports, upload CSV, or access a private interface.
Approval Boundaries
Require approval before using any export, generating a live upload, opening a worker record, or running the documented dashboard/connector operation. Local PASS does not authorize production use.
Output
Return workflow/source, synthetic-fixture manifest, mapping version, invariants, test matrix, reconciliation counts, assumptions, unproven provider behavior, rollback design, live-validation owner, and approval state.
Error Handling
- Production-like data detected: quarantine and replace with synthetic fixtures.
- Schema source missing: block; do not infer fields from stale examples.
- Reconciliation mismatch: fail without producing a candidate upload.
- Provider behavior unknown: label it PENDING rather than simulating certainty.
Examples
- A contractor-hours fixture with the two documented headers can test decimals, duplicates, and unknown users without containing real email addresses.
- "Download production workers for better fixtures" is rejected.
- A local Workday mapping test states that it cannot prove scheduled sync behavior.
Validation
- Fixtures are demonstrably synthetic and contain no credentials or personal data.
- Counts balance and every rejected case has a deterministic reason.
- Local and live acceptance criteria are clearly separated.
Resources
See references/official-docs.md for the reviewed timesheet, report, Workday, ADP, payroll, and support contracts.