qa-manual-istqb

v2026.09.24

Create QA artifacts from requirements: test plans, test conditions/cases, bug reports, regression suites, traceability, and exploratory charters. Use for test planning, test design, defects, coverage, or QA deliverables. Applies ISTQB risk-based techniques and loads templates only when needed. Keywords: test plan, test case, bug report, traceability, regression suite, QA artifact.

GitHub
Install command
npx skhub add fugazi/qa-manual-istqb
Markdown
SKILL.md

QA Test Design & ISTQB Artifacts

Complete ISTQB Foundation Level (CTFL) aligned workflow for QA test engineers covering: Test Planning → Test Analysis → Test Design → Test Implementation → Test Execution → Test Completion

When to Use This Skill

  • Drafting ready-to-fill QA deliverables from requirements, user stories, or acceptance criteria
  • Creating or reviewing test plans and test strategies
  • Generating test conditions and test cases from requirements
  • Applying test design techniques (EP, BVA, decision tables, state transitions, use cases)
  • Writing bug reports and managing defect lifecycle
  • Building regression suites with risk-based selection
  • Creating traceability matrices (requirements ↔ tests ↔ defects)
  • Conducting exploratory testing sessions with charters
  • Estimating test effort using ISTQB techniques
  • Reviewing testware through static testing practices
  • Selecting automation candidates and preparing traceable Playwright scaffolds

Do NOT Use For

  • Authoring/maintaining versioned Playwright spec code (use playwright-e2e-testing).
  • Selenium/Java test authoring (use webapp-selenium-testing).
  • Driving a live browser to debug (use playwright-cli) or governing an existing regression suite's CI (use playwright-regression-testing).
  • Adversarial strategy critique — that is the grill-me-qa skill's purpose; this skill produces artifacts, it does not interrogate them.

Prerequisites

RequirementNotes
Node.js 18+Required for CLI script and Playwright
Playwrightnpm init playwright@latest for automation
Text editorFor creating/editing markdown and CSV artifacts
GitRecommended for testware version control

Quick Start (choose one)

  • Create a test plan: use templates/test-plan.md as a starting point.
  • Create a test summary report: use templates/test-summary-report.md.
  • Generate test cases: use templates/test-cases.csv and fill it from the test basis (requirements, user stories, acceptance criteria).
  • Create a bug report: use templates/bug-report.md.
  • Create a bug log: use templates/bug-log.csv.
  • Create traceability: use templates/traceability-matrix.csv.
  • Build a regression suite definition: use templates/regression-suite.md.
  • Scaffold Playwright tests: use templates/playwright-spec.ts and adapt to the system under test.
  • Run exploratory testing: use templates/exploratory-charter.md to timebox and capture outcomes.

If running locally, generate artifacts with the bundled CLI:

node scripts/qa_artifacts.mjs list
node scripts/qa_artifacts.mjs create test-plan --out specs --project "My App" --release "R1"
node scripts/qa_artifacts.mjs create test-cases --out specs --feature "Checkout"
node scripts/qa_artifacts.mjs create bug-report --out specs/bugs --title "Search returns 500"

Inputs to collect (ask if missing)

  • Test basis: requirements, user stories, acceptance criteria, designs, risk register, defect history.
  • Scope: in-scope/out-of-scope features, target platforms/browsers/devices, locales, accessibility, integrations.
  • Quality risks: what can fail, impact, likelihood, regulatory/compliance, critical user journeys.
  • Constraints: deadlines, environments, data availability, tooling, access/roles, CI/CD expectations.
  • Definitions: severity vs priority scale, test levels and test types to cover, entry/exit criteria.

Workflows

1) Create a test plan (and/or test strategy)

  1. Identify test objectives, scope, assumptions, and constraints from the test basis.
  2. Define test levels and types (functional + change-related + key non-functional, as applicable).
  3. Choose test design techniques per area (see references/test-design-techniques.md).
  4. Specify environments, test data, tooling, and configuration management needs.
  5. Define entry/exit criteria, deliverables, and reporting cadence/metrics.
  6. Add a risk matrix and mitigation actions; prioritize testing accordingly (risk-based testing).

Use: templates/test-plan.md (detailed sections + checklists).

2) Generate test conditions and test cases

  1. Convert the test basis into test conditions (what to test) before writing step-by-step cases.
  2. For each condition, pick a technique:
    • Equivalence partitions and boundary values for inputs/validation.
    • Decision tables for rule combinations.
    • State transitions for lifecycle/flows.
    • Use-case/scenario tests for end-to-end journeys.
    • Exploratory testing sessions to learn quickly (see templates/exploratory-charter.md).
  3. Write test cases that are atomic, unambiguous, and traceable to requirement/user story IDs.
  4. Add expected results that are observable and measurable (define the test oracle).
  5. Add priority and risk tags to support risk-based regression selection.
  6. Mark automation candidates using stability + value criteria (see references/automation-playwright-best-practices.md).

Use: templates/test-cases.csv.

3) Prepare automation candidates and Playwright scaffolds

  1. Select candidates using stability, value, and risk criteria (see references/automation-playwright-best-practices.md).
  2. Create a traceable scaffold from templates/playwright-spec.ts, including the test case ID and suite tags.
  3. Use playwright-e2e-testing to implement and maintain the versioned UI spec, fixtures, and test infrastructure.

4) Build and maintain regression suites

  1. Define suite tiers (example): smoke (critical paths), sanity (build verification), regression (broad), full (release).
  2. Select tests using risk + frequency + criticality + defect history (not only coverage).
  3. Tag tests consistently and document selection rules and ownership.
  4. Review the suite regularly: remove obsolete coverage, add coverage for escaped defects and high-risk changes.

Use: templates/regression-suite.md and references/regression-suite-strategy.md.

5) Create bug reports and document bugs effectively

  1. Reproduce reliably; reduce to minimal steps; note variability (frequency) and scope.
  2. Capture environment details (build/app version, OS, browser/device, account/role, data conditions).
  3. Describe expected vs actual behavior; include impact; set severity and priority consistently.
  4. Attach evidence (screenshots, console logs, network traces, Playwright trace) and link related tests/requirements.
  5. Track lifecycle: triage notes, owner, fix version, verification steps and results, closure criteria.

Use: templates/bug-report.md and references/bug-report-quality.md.

6) Conduct static testing (reviews)

  1. Schedule reviews early (shift-left): requirements, designs, test plans, test cases.
  2. Use checklists for consistency (see references/static-testing.md).
  3. Document findings with severity and actionability.
  4. Track defects found in static testing separately (prevention vs detection).

Use: references/static-testing.md for review checklists and techniques.

7) Estimate test effort

  1. Identify factors: scope, complexity, risk, team experience, tool maturity.
  2. Apply estimation techniques (see references/test-estimation.md):
    • Expert judgment / historical data
    • Test point analysis
    • Work breakdown structure
  3. Add contingency for risks and unknowns.
  4. Review and refine estimates as the project progresses.

Use: references/test-estimation.md for techniques and formulas.

8) Monitor test progress and metrics

  1. Track execution metrics: planned vs executed vs passed vs failed vs blocked.
  2. Monitor defect metrics: found vs fixed vs open, by severity/priority.
  3. Calculate test coverage: requirements covered, risk areas tested.
  4. Report status regularly and escalate blockers early.

Use: references/test-monitoring-metrics.md for metrics definitions and dashboards.

Quality Gates (self-check)

  • Test plan includes scope, approach, risks, environments, entry/exit criteria, deliverables, and metrics.
  • Test cases are traceable, atomic, deterministic, and include clear oracles and data.
  • Automation is maintainable (stable locators, minimal flake, independent tests, clear assertions).
  • Regression is risk-based, tagged, and curated with clear add/remove rules.
  • Bug reports are reproducible, actionable, and contain evidence + environment + impact.
  • Static testing reviews are documented with findings tracked to resolution.
  • Estimates include contingency and are refined as scope clarifies.

Troubleshooting

ProblemCauseSolution
Test cases lack traceabilityMissing requirement IDsAdd requirement_id column; link to user stories/ACs
Bug reports get rejectedInsufficient reproduction stepsUse minimal steps; include exact data and environment
Regression suite too slowToo many tests, no prioritizationApply risk-based selection; tier into smoke/sanity/full
Flaky automated testsUnstable locators or timingUse data-testid; avoid sleeps; use Playwright auto-waits
Test estimates are wrongScope creep, missing risksAdd contingency; re-estimate when scope changes
Reviews find no defectsSuperficial reviewUse checklists; allocate sufficient time; rotate reviewers
Unclear test oraclesMissing expected resultsDefine oracles from requirements, rules, or reference systems

Bundled Resources

Templates (templates/)

TemplatePurpose
test-plan.mdISTQB-aligned test plan structure
test-summary-report.mdEnd-of-cycle summary and sign-off
test-cases.csvTest case repository with traceability
test-conditions.mdTest conditions derived from test basis
traceability-matrix.csvRequirements ↔ tests ↔ defects mapping
bug-report.mdDetailed defect report
bug-log.csvDefect tracking log
regression-suite.mdSuite definition and selection rules
exploratory-charter.mdSession-based exploratory testing
playwright-spec.tsPlaywright test scaffold
test-environment-checklist.mdEnvironment readiness verification
risk-assessment-matrix.mdQuality risk identification and prioritization

References (references/)

ReferenceContent
test-design-techniques.mdEP, BVA, decision tables, state transitions, use cases
experience-based-techniques.mdError guessing, checklist-based, exploratory
static-testing.mdReviews, walkthroughs, inspections
test-levels-types.mdUnit, integration, system, acceptance; functional, non-functional
test-estimation.mdEstimation techniques and factors
test-monitoring-metrics.mdProgress tracking and quality metrics
risk-based-testing.mdRisk identification, analysis, mitigation
istqb-glossary.mdKey ISTQB terminology
test-process-and-deliverables.mdTest process phases and outputs
automation-playwright-best-practices.mdPlaywright implementation guidance
regression-suite-strategy.mdSuite management and optimization
bug-report-quality.mdEffective defect reporting
defect-lifecycle.mdDefect states and workflow

Scripts (scripts/)

ScriptPurpose
qa_artifacts.mjsCLI tool to generate QA artifacts from templates

Red Flags

  • Generating test cases with no link back to a requirement or risk — untraceable coverage is theatre.
  • Bug reports missing repro steps, expected vs actual, or environment — unusable for developers.
  • Regression suites selected by gut feel instead of risk/change analysis — wasted effort and missed regressions.
  • Test plans with no entry/exit criteria or effort estimate — execution cannot be governed.
  • Confusing this artifact-producing skill with strategy critique (use grill-me-qa for adversarial review).

Verification

  • Test cases follow ISTQB structure — Each case has: ID, description, preconditions, steps, expected result (actual result populated after execution)
  • Coverage matrix maintained — Requirements mapped to test cases; no uncovered requirements
  • Traceability maintained — Each test case links to a requirement or user story
Discovery
Tags

No tags published for this skill.

Version
Latest version metadata

Version

v2026.09.24

Published

Sep 24, 2026

Category

Uncategorized

License

MIT

Source path

skills/qa-manual-istqb

Default branch

main

Latest commit

db514b5

Tree SHA

337a095