Create bills of quantities and estimates in OpenConstructionERP: search cost items, build BOQ sections, link BIM elements in bulk, validate the BOQ, and export GAEB/XLSX/JSON. Use for any estimating workflow on the platform.

GitHub
Install command
npx skhub add datadrivenconstruction/oce-estimate-boq
Markdown
SKILL.md

BOQ & Estimation in OpenConstructionERP

Workflow

  1. Pick a cost base — load it (see oce-load-cost-bases) so items are searchable.
  2. Create the BOQ — POST /api/v1/boqs with project, currency, classification standard (DIN 276 / NRM / MasterFormat / regional).
  3. Find items — GET /api/v1/costs/?region=TR_NATIONAL&q=duvar (SQL search) or the semantic path (/qdrant-search when Qdrant is on). Every item carries a components[] breakdown (labour/material/machine with norm quantities and unit prices).
  4. Link quantities — either manual entry, BIM bulk-link (POST /api/v1/bim/elements/bulk-link style endpoints aggregate area/volume/length per element), or PDF/DWG takeoff measurements.
  5. Validate — POST /api/v1/boqs/{id}/validate/ runs rule packs (BOQ quality, DIN276, NRM, GAEB) and returns violations; quality score updates live.
  6. Export — GAEB X83/X84, XLSX, JSON for tendering.

Cost item anatomy (what the platform stores per item)

{
  "code": "15.115.1008",
  "description": "El veya kompresörle ... yumuşak kaya kazılması",
  "unit": "m³",
  "rate": 1044.5,
  "currency": "TRY",
  "classification": {"collection":"İnşaat","department":"İnşaat","section":"15.115","category":"CONSTRUCTION WORK"},
  "components": [
    {"name":"Kompresör","type":"equipment","quantity":0.2,"unit_rate":1991.73,"cost":398.35},
    {"name":"Düz işçi","type":"labor","quantity":1.25,"unit_rate":165.0,"cost":206.25}
  ],
  "metadata": {"labor_cost":437.25,"equipment_cost":398.35,"labor_hours":3.83}
}

Estimation inputs the platform supports

InputPathNotes
Natural languagePOST /api/v1/costs/match (or AI estimate)multi-lingual matching
PhotoAI photo-to-BOQ (GPT-4o + YOLO)returns scoped BOQ with confidence
BIM modelelement → cost matching (/suggest-for-element)uses volume/area from the model
DWG/PDFtakeoff measurementvectors/rooms detected, pushed into BOQ

Pricing notes (honest rules)

  • National bases are priced in their home currency; markets are PPP-repriced upstream (no FX inside the platform).
  • Coefficient bases (Vietnam Dinh Muc, Indonesia AHSP) import with rate = 0 — attach a market resource price sheet before estimating.
  • Turkey positions carry the source book's markup (e.g. 25% contractor profit) inside total_cost_per_position; resource sums reconcile to total_resource_cost_per_position.

Best practices

  1. Always verify unit matches your takeoff quantity (m²/m³/m/kg).
  2. Check the components[] sum against rate before committing a binding estimate.
  3. Keep the region currency on the BOQ; never blend currencies in one total.
  4. Re-run validation after every bulk edit — the quality score is the fastest signal.
Discovery
Tags

No tags published for this skill.

Version
Latest version metadata

Version

v2026.09.24

Published

Sep 24, 2026

Category

Uncategorized

License

MIT

Source path

6_OpenConstructionERP/oce-estimate-boq

Default branch

main

Latest commit

ce45bbf

Tree SHA

e20d7ee