pm-career-ladder

v2026.09.24

PM career ladder rubrics from APM through VP/CPO across product sense, execution, leadership, strategy, and communication. Includes gap analysis, growth planning, and promotion packet templates.

GitHub
Install command
npx skhub add borghei/pm-career-ladder
Markdown
SKILL.md

PM Career Ladder Expert

Overview

A consolidated, opinionated PM career ladder for ICs from APM to Group PM and managers from Director to VP/CPO. The ladder spans five capability dimensions -- product sense, execution, leadership, strategy, and communication -- with explicit behaviors per level. It bundles a level-by-level rubric, a gap-analysis worksheet, a 6-month growth plan template, and a promotion packet template. A level is reached when a PM operates at that bar consistently across all five dimensions for >=2 quarters, not the high-water mark of a single quarter.

Core Capabilities

  • Level rubric -- five dimensions x seven levels (APM, PM, Sr PM, Group PM, Director, VP/CPO) with observable behaviors and promotion signals per level
  • Gap analysis -- self-score vs. independent manager-score, surface calibration gaps, prioritize 2-3 dimensions to develop
  • Growth planning -- translate gaps into a 6-month plan of experiments, evidence, and manager support
  • Promo packet -- scope statement, quantified impact, rubric mapping, partner quotes, growth narrative

When to Use

  • Mid-cycle self-assessment -- Calibrate where you are vs. where you want to be in 6-12 months.
  • Growth planning -- Translate the gap into a concrete 6-month plan with experiments and evidence.
  • Promotion preparation -- Build a promo packet that lines up your impact against the rubric for the next level.
  • Manager 1:1s -- Bring the rubric to your 1:1 to make growth conversations concrete instead of vibes-based.
  • Hiring calibration -- As a hiring manager, use the rubric to level a candidate's interview signal.

When NOT to use: interview prep (use pm-interview-prep/), new-role onboarding (use pm-onboarding/), 1:1 templates (use pm-1on1s/).

Clarify First

Before generating the assessment or plan, confirm these inputs. If any is unknown or vague, ASK — do not assume:

  • Current and target level — APM, PM, Sr PM, Group PM, Director, or VP/CPO (sets which rubric bar to score against)
  • Artifact — gap analysis, 6-month growth plan, or promo packet (each uses a different template and depth)
  • Track — IC ladder (APM-GPM) vs management ladder (Director-VP/CPO) (shifts which of the 5 dimensions dominate)
  • Evidence base — quantified impact + partner quotes on hand (a promo packet without evidence is just a self-claim)

Stop rule: ask only the 2-3 that most change the output. If the user says "just draft it," proceed and list your assumptions at the top of the artifact.

Quick Start

  1. Self-score the 5x6 rubric for your current and next level; have your manager score independently.
  2. Pick 2-3 dimensions where you are below bar.
  3. Write a 6-month growth plan (experiments + evidence) and review monthly in your 1:1.
  4. Maintain a quarterly written impact summary; assemble the promo packet by the 3-month mark of the cycle.

See references/ladder-playbook.md for the full ladder table, rubric detail, gap-analysis steps, growth-plan and promo-packet structures, and troubleshooting.

References

  • references/ladder-playbook.md — the full 5x6 ladder table, per-level rubric behaviors and promotion signals, gap-analysis process, 6-month growth plan, promo packet structure, workflow, troubleshooting, and success criteria. Read when scoring yourself or building a plan/packet.
  • references/ladder-rubric-detail.md — each dimension expanded across levels with "looks like" behaviors, anti-patterns, and promotion signals. Read when you need fine-grained behavioral detail for one dimension.
  • references/red-flags.md — common ways ladder self-assessments and promo packets go wrong, with fixes. Read before submitting a packet or a self-score.
  • assets/gap_analysis.md — self-scoring + manager-scoring worksheet.
  • assets/growth_plan.md — 6-month growth plan template.
  • assets/promo_packet.md — promotion packet template.

External: Square's published PM ladder; Wodtke, C. Radical Focus.

Scope & Limitations

In scope: IC ladder (APM-GPM) and management ladder (Director-VP/CPO); gap analysis, growth planning, promo packet templates; self-scoring rubric across 5 dimensions; conversation prompts for managers and skip-levels.

Out of scope: compensation/salary calibration (use levels.fyi, Pave, or comp bands); interviewer-side hiring rubrics; job-change/negotiation strategy; company-specific ladders (this is a consolidated industry baseline).

Caveats: Every company calibrates differently — a startup "Sr PM" != a 5,000-person "Sr PM"; adjust for context. Promotion is part meritocratic, part political; the rubric covers the meritocratic half. Growth is non-linear — continuous investment matters more than even-paced advancement.

Integration Points

IntegrationDirectionWhat Flows
pm-interview-prep/BidirectionalThe rubric calibrates the bar for external interviews and internal calibration the same way
pm-onboarding/Feeds intoNew-role onboarding ends with the first ladder self-score
pm-1on1s/BidirectionalQuarterly 1:1s review ladder progress; the ladder structures the conversation
senior-pm/stakeholder-mapper/ReusesPromotion requires stakeholder support; the stakeholder mapper helps map the calibration room
personal-productivity/weekly-review/Feeds intoWeekly review captures evidence that aggregates into the monthly impact summary
Discovery
Tags

No tags published for this skill.

Version
Latest version metadata

Version

v2026.09.24

Published

Sep 24, 2026

Category

Uncategorized

License

NOASSERTION

Source path

project-management/career/pm-career-ladder

Default branch

main

Latest commit

f308cbd

Tree SHA

d30ff9d